手机扫描二维码答题
00:00:00
RMU 2025 Referee System Exam (Basics)
录音中...
*
Basic information
School
School
Name
Name
*
Participants will be well-equipped to use Referee System Onboard Modules after thoroughly reading and understanding the Robot Building Specifications Manual.
True
False
*
What step is not required when the borrowed Referee System Onboard Modules are inspected for quality acceptance?
Connect each module to the Internet and update to the latest firmware version.
Connect the Main Control Module to the server, and the configuration table automatically updates.
Film the unboxing and acceptance inspection process in one shot.
Install the modules on the robot and connect to the server to start the competition. Check if all mechanisms are functioning properly.
*
All Ground Robots are equipped with a Video Transmitter Module (Transmitter).
True
False
*
What precautions should be taken when connecting the Referee System Onboard Modules?
【多选题】
Connect the cables appropriately according to the robot’s situation, and ensure that the cables are securely connected to prevent damage and wear.
Connect the cables to the corresponding ports in accordance with the user manual to avoid incorrect connections due to similar ports.
For more secure cable connections, teams are advised to use the cables that come with the modules provided by the RMOC.
When connecting the cables, ensure that the current is evenly distributed among all circuits to avoid unstable operations.
*
Upon receiving the borrowed Referee System Onboard Modules, teams should install the modules on the corresponding robots for acceptance inspection.
对
错
*
Which of the following descriptions of the borrowed Referee System Onboard Modules are correct?
【多选题】
The borrowed Referee System Onboard Modules may have been repaired.
The borrowed Referee System Onboard Modules have undergone factory acceptance testing. Users will not encounter functional issues with the modules if they use the modules properly.
The borrowed Referee System Onboard Modules are merely repackaged after damage assessment, so they are prone to functional issues.
The borrowed Referee System Onboard Modules may have minor scratches that do not affect usage, and these marks do not incur damage assessment charges.
*
In the RMUC, up to two Infantries are allowed per team in the Regional Competition and up to three ones are allowed in the Final Tournament.
True
False
*
Which statement about the sight of the Speed Monitor Module is correct?
The sight of the Speed Monitor Module contains a bump inside the module. If participating teams believe that this bump will affect the projectile’s trajectory, they can remove the sight.
If the sight of the Speed Monitor Module is removed, it does not need to be returned, along with the Referee System, to the RMOC at the end of the season.
Since the properly packaged sight of the Speed Monitor Module no longer contains a bump inside the module, if participating teams still need to use this bump, they can fill out a questionnaire to apply to the RMOC for a sight with a bump.
If a team has received a sight with a bump, the original sight without a bump does not need to be returned, along with the Referee System, to the RMOC at the end of the season.
*
While using the RoboMaster Referee System provided by the RMOC, teams are required to respect all intellectual property rights in the product. Teams are prohibited from engaging in any behavior that infringes intellectual property rights, including but not limited to reverse engineering, replication, and translation.
对
错
*
Which of the following descriptions of the purchased Referee System Onboard Modules are correct?
【多选题】
Purchased Referee System Onboard Modules may become unusable after module iteration.
The RMOC will provide eligible teams with a corresponding number of Referee System Onboard Modules that can be borrowed. It is recommended that participating teams cut module purchases or avoid purchasing the modules.
In the 2025 season, the functions vary between the purchased Referee System Onboard Modules and the borrowed ones.
The purchased Referee System Onboard Modules cannot be used in official competitions.
The purchased Referee System Onboard Modules may have been repaired.
*
Which types of robots are equipped with a Video Transmitter Module (Transmitter)?
【多选题】
Infantry
Drone
Sentry
Dart System
Radar
*
In case of an issue with the Referee System, what resources can be consulted for solutions?
【多选题】
Participant Manual
Referee System User Manual
Robot Building Specifications Manual
User Manuals of Referee System Onboard Modules
Referee System FAQ
*
How should I handle an issue that I encounter while using the Referee system?
【多选题】
Submit a query form through QingFlow to seek official answers.
Try solving the issue with solutions from non-official sources.
Consult the relevant user manual and follow the standard procedure.
Try your luck on solving the issue.
If the issue remains unresolved after you consult relevant information, submit a technical support form through QingFlow to seek official answers.
*
What static IP address should be set for the RoboMaster Champion server host?
*
Robot ID and Robot Number are the same.
True
False
*
What precautions should be taken when installing Referee System Onboard Modules?
【多选题】
When securing the modules, teams should use screws with the diameter indicated in the user manual.
The locations where the modules are installed should comply with the specifications, and the modules should be securely installed to prevent any danger.
For through-hole mounting, teams do not need to consider the screw length. They only need to ensure modules are securely fixed.
For bind-hole installation, ensure that the screws do not go deeper in the blind hole than what is specified in the user manual.
*
What should be prepared before unboxing the borrowed Referee System Onboard Modules?
【多选题】
RoboMaster Tool
Server
Player's Client
Robots
Video recording equipment
A water basin
*
Which of the following statements are correct about the use of RoboMaster Champion software for debugging and training in the 2025 season?
【多选题】
If the RoboMaster Champion software for the 2025 season is not updated, participating teams can use the latest version of the RoboMaster Champion software from the previous season.
After the RoboMaster Champion software for the 2025 season is updated, log in to the official website, and select “Developer Tools” > “Referee System” > “Software — Current Season”. Click on the corresponding module and click download on the download page.
After the RoboMaster Champion software for the 2025 season is updated, the RoboMaster Champion software from the previous season can still be used.
After the RoboMaster Champion software for the 2025 season is updated, participating teams must download and familiarize themselves with the user manual for the latest version of the software.
After the RoboMaster Champion software for the 2025 season is updated, participating teams do not need to read the user manual for the latest version of the software.
*
Which types of robots are equipped with a Light Indicator Module?
【多选题】
Hero
Engineer
Drone
Sentry
Dart System
Radar
*
What precautions should be taken when inspecting the borrowed Referee System Onboard Modules for quality acceptance?
【多选题】
Ensure the power supply voltage meets the requirements in the user manual.
Ensure correct cable connections to avoid reverse polarity or short circuits.
Do not conduct acceptance inspection indoors.
Ensure the modules are placed correctly to avoid functional issues due to improper placement.
*
Due to the outstanding compatibility of the RoboMaster Champion with Referee System Onboard Modules, an older version of the RoboMaster Champion can work well with the latest version of Onboard Modules during testing.
True
False
*
Balancing Infantry needs to have two Large Armor Modules installed, whereas regular Infantry needs to have four Small Armor Modules installed.
True
False
*
In the RMUL, the robot line-up in the 3V3 Match can be “1 Hero + 1 Infantry” or “2 Infantries.”
True
False
*
Which of the following are considered Referee System Onboard Modules?
【多选题】
RFID Interaction Module
Dart Trigger
Supercapacitor Management Module
17 mm Fluorescent Projectile Energy-Charging Device
Video Transmitter Module
Armor Support Frame
*
Upon receiving the borrowed Referee System Onboard Modules, teams should connect all modules properly to robots in one sitting, and power robots on to inspect the functionality of modules for quality acceptance.
对
错
评价对象得分
字体大小
RMU 2025 Referee System Exam (Basics)
复制